Aegis

Aegis The Proof Phase Specification

This document establishes the 5 Proof Gates for Aegis.

With the architecture and public API contracts frozen, engineering priorities shift from feature building to proving operational reliability, ease of migration, usability, performance, and adoption.


1. The 5 Proof Gates

[Proof 1] Operational Reliability (24h/72h/168h Soak Tests & Chaos Scenarios)
      ↓
[Proof 2] Migration Simplicity (Zero-Touch PM2 & Systemd Conversion)
      ↓
[Proof 3] Onboarding Usability (Sub-5 Minute Installation & Detection)
      ↓
[Proof 4] Performance Compliance (Enforced SLO Targets & Zero Regression)
      ↓
[Proof 5] Real-World Adoption (Closed & Public Production Beta Feedback)

2. Gate Exit Criteria

Proof 1 — Operational Reliability

Exit Criteria:

Proof 2 — Migration Simplicity

Exit Criteria:

Proof 3 — Onboarding Usability

Exit Criteria:

Proof 4 — Performance Compliance

Exit Criteria:

Proof 5 — Real-World Adoption

Exit Criteria:

Proof 6 — System Recoverability

Exit Criteria: